Ultralift Projects

Maintainance of Stacker Crane and Conveyor System

No Comments »Written on November 14th, 2010 by Ultra Lift
Categories: Ultralift Projects


1-maintenance-of-near-ailse-stacker-crane


2-leveling-of-near-aisle-stacker-crane


3-near-aisle-stacker-crane-being-tested


4-near-aisle-stacker-cranes-in-operation-maintaind-by-ultralift-mh


5-view-of-part-of-conveyor-system-maintained-by-ultralift-mh


6-conveyor-system-maintained-by-ultralift-mh

Production and installation of Access Stairs and Lifting Beam

No Comments »Written on November 14th, 2010 by Ultra Lift
Categories: Ultralift Projects


1-access-stairs-designed-manufactured-and-installed-by-ultralift-mh-for-saint-gobain-glass-uk


2-lifting-spreader-beam-10t-designed-manufactured-and-tested-by-ultralift-mh-for-drax-power-station


3-bp-energy-lifting-beam-arrangement


4-bp-energy-lifting-beam


5-bp-energy-lifting-beam-above-water-pump-system


6-pillar-jib-arm-above-boiler-pressure-valves


7-lightweight-pillar-jib-designed-manufactured-installed-and-tested-by-ultralift-mh

Completion of Warehouse

No Comments »Written on November 14th, 2010 by Ultra Lift
Categories: Ultralift Projects


1-sse-workshop-column-foundations-complete-commencement-of-steelwork-installation-copy


1-sse-workshop-column-foundations-complete-commencement-of-steelwork-installation


2-sse-workshop-steelwork-installation


3-sse-workshop-80mm-thick-steel-cladding-being-installed


4-sse-workshop-completed-internal-works-with-5t-overhead-crane-and-electical-sockets-fitted


5-sse-workshop-internal-view-with-4m-x-5m-electric-roller-shutter-door


6-sse-workshop-internal-view-with-5t-overhead-crane


7-sse-workshop-external-works-complete

Construction of Warehouse Frame and Structure

No Comments »Written on November 14th, 2010 by Ultra Lift
Categories: Ultralift Projects


1-doosan-babcock-workshop-eggborough-power-site-setup


2-doosan-babcock-workshop-eggborough-power-groundworks


3-doosan-babcock-workshop-eggborough-power-steelwork-installation


4-doosan-babcock-workshop-eggborough-power-completed-steelwork-with-roof-sheeting-complete-lifting-runway-beam-fitted-and-tested-to-swl-3t